{"id":17348,"date":"2026-11-26T12:33:12","date_gmt":"2026-11-26T11:33:12","guid":{"rendered":"https:\/\/www.danubecommission.org\/dc\/?p=17348"},"modified":"2026-11-26T12:33:12","modified_gmt":"2026-11-26T11:33:12","slug":"working-meeting-with-the-ministry-of-transport-of-the-czech-republic","status":"publish","type":"post","link":"https:\/\/www.danubecommission.org\/dc\/en\/2026\/11\/26\/working-meeting-with-the-ministry-of-transport-of-the-czech-republic\/","title":{"rendered":"Working meeting with the Ministry of Transport of the Czech Republic"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>25 November 2026 | Budapest <\/strong>\u2013 The Secretariat of the Danube Commission welcomed in Budapest the representatives of the <strong>Water Transport Department<\/strong> at the <a href=\"https:\/\/md.gov.cz\/\">Ministry of Transport of the Czech Republic<\/a>, as part of the regular interactions between DC and its observer states. \u00a0Discussions focused on shared priorities and future cooperation in inland waterway transport and the sustainable development of the Danube corridor.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-17349 aligncenter\" src=\"https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2026\/11\/IMG_4768-resized.jpg\" alt=\"\" width=\"800\" height=\"800\" srcset=\"https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2026\/11\/IMG_4768-resized.jpg 800w, https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2026\/11\/IMG_4768-resized-300x300.jpg 300w, https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2026\/11\/IMG_4768-resized-150x150.jpg 150w, https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2026\/11\/IMG_4768-resized-768x768.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n<p style=\"text-align: justify;\">This practical dialogue was an important step for both sides in keeping European inland waterways efficient, green, and well-connected.<\/p>\n<p style=\"text-align: justify;\">Participants examined current European socio-economic developments and traffic flows on the Danube, focusing on the role of inland waterway transport alongside other modes\u2014specifically looking at transport origins and destinations in the Czech Republic. Both sides also addressed the impacts of the 2026 extreme low water levels on the Danube and reviewed vessel modernization efforts in the Czech Republic and the Danube region to reduce environmental impact.<\/p>\n<p style=\"text-align: justify;\">In addition, discussions covered digitalization through the <a href=\"https:\/\/www.viadonau.org\/en\/company\/project-database\/comex2-river-information-services-corridor-management-execution2\">RIS COMEX 2<\/a> and <a href=\"https:\/\/divine-iwt.eu\/\">DiVINE<\/a> projects, alongside <a href=\"https:\/\/bmprojektek.kormany.hu\/download\/3\/6a\/a0000\/Priority%20Area%201a%20of%20the%20Danube%20Region%20Strategy%20on%20Inland%20Waterways.pdf\">Priority 1A<\/a> (\u2018Water Transport and Waterways\u2019) of the Danube Strategy, Joint Statement 2.0, <a href=\"https:\/\/www.inlandnavigation.eu\/commission-publishes-naiades-3-action-programme\/\">NAIADES III<\/a> objectives, and the <a href=\"https:\/\/platina4action.iwtprojects.eu\/\">PLATINA4Action<\/a> project. Finally, the Secretariat shared updates on its ongoing institutional reforms, while both parties outlined their cooperation priorities for 2027\u20132028.<\/p>\n<p style=\"text-align: justify;\">The Secretariat of the Danube Commission thanks its Czech partners for the constructive exchange and looks forward to continuing this work together.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>25 November 2026 | Budapest<\/strong><\/p>\n","protected":false},"author":99,"featured_media":17349,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","video_url":"","footnotes":""},"categories":[112],"tags":[],"class_list":["post-17348","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts\/17348","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/users\/99"}],"replies":[{"embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/comments?post=17348"}],"version-history":[{"count":1,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts\/17348\/revisions"}],"predecessor-version":[{"id":17350,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts\/17348\/revisions\/17350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/media\/17349"}],"wp:attachment":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/media?parent=17348"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/categories?post=17348"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/tags?post=17348"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}