{"id":8286,"date":"2021-02-17T11:23:00","date_gmt":"2021-02-17T10:23:00","guid":{"rendered":"https:\/\/www.danubecommission.org\/dc\/?p=8286"},"modified":"2021-03-12T15:21:27","modified_gmt":"2021-03-12T14:21:27","slug":"meteet-workshop-on-environmental-legislation-requirements-and-inland-waterway-navigation-projects-will-be-held-online-on-16th-march-2021-from-9-a-m-till-1-p-m-cet","status":"publish","type":"post","link":"https:\/\/www.danubecommission.org\/dc\/en\/2021\/02\/17\/meteet-workshop-on-environmental-legislation-requirements-and-inland-waterway-navigation-projects-will-be-held-online-on-16th-march-2021-from-9-a-m-till-1-p-m-cet\/","title":{"rendered":"METEET workshop on environmental legislation requirements and inland waterway navigation projects will be held online on 16th March 2021 from 9 a.m. till 1 p.m. CET."},"content":{"rendered":"<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\">The workshop intends to demonstrate that inland waterway infrastructure development and environmental protection are not an unsolvable trade-off but can be turned into a win-win situation with the help of interdisciplinary planned and implemented projects.<\/p>\n<p style=\"text-align: justify;\">Please find attached the <a href=\"https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2021\/02\/20210316_invitation_IAS.pdf\">invitation letter<\/a> of the Rhine-Danube Corridor Coordinator, Mrs. In\u00e9s AYALA SENDER as well as the <a href=\"https:\/\/www.danubecommission.org\/dc\/wp-content\/uploads\/2021\/02\/METEET_FINAL_agenda_12032021.pdf\">final agenda<\/a>.<\/p>\n<ul>\n<li>Please register the participants that will attend the meeting<\/li>\n<li>Please note that all\u00a0<em>fields marked with an asterisk (*)<\/em>\u00a0are required.<\/li>\n<\/ul>\n<p>[rtec-registration-form event=8250]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The workshop intends to demonstrate that inland waterway infrastructure development and environmental protection are not an unsolvable trade-off but can be turned into a win-win situation with the help of interdisciplinary planned and implemented projects.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","footnotes":""},"categories":[182],"tags":[],"class_list":["post-8286","post","type-post","status-publish","format-standard","hentry","category-events"],"_links":{"self":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts\/8286","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/comments?post=8286"}],"version-history":[{"count":0,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/posts\/8286\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/media?parent=8286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/categories?post=8286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.danubecommission.org\/dc\/wp-json\/wp\/v2\/tags?post=8286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}